ABC Family Arquivos Brasileiros de Cardiologia International Journal of Cardiovascular Sciences ABC Heart Failure & Cardiomyopathy ABC Imagem Cardiovascular
Português English
  • ABC Family
  • Arquivos Brasileiros de Cardiologia
  • International Journal of Cardiovascular Sciences
  • ABC Heart Failure & Cardiomyopathy
  • ABC Imagem Cardiovascular
Português English
  • About
    • About ABC Family
    • Internal Regulation
    • Editorial Board
    • Brazilian Society of Cardiology (SBC)
  • Issues
  • SBC Guidelines
  • Content
    • Videos
    • Podcasts
    • News
  • About
    • About ABC Family
    • Internal Regulation
    • Editorial Board
    • Brazilian Society of Cardiology (SBC)
  • Issues
  • SBC Guidelines
  • Content
    • Videos
    • Podcasts
    • News
Search in

No content found.

Journals
Ordering
Article types
Others

  1. Home
  2. critical pathways
ABC
Artigo Original

Noninvasive assessment of patients undergoing percutaneous intervention in myocardial infarction

Rica Dodo Delmar Buchler et al. Expedito E. Ribeiro Antonio de Padua Mansur Paola Smanio … Romeu Sergio Meneghelo William Azem Chalela Carlos Alberto Buchpiguel Jorge Roberto Buchler Eric R. Bates Eulogio E. Martinez

BACKGROUND: Restenosis after primary percutaneous coronary intervention (PPCI) remains an important clinical problem, even with stent implantation. The ability of noninvasive testing to diagnose restenosis has had only inconsistent demonstration. OBJECTIVE: Our objective was to evaluate the ability of exercise treadmill testing (ETT) and myocardial perfusion imaging (MPI) to diagnose restenosis in patients treated by PPCI within 12 hours of ST-elevation myocardial infarction (STEMI). METHODS: From August 2003 to January 2006, 64 patients (mean age of 56.2±10.2 years, 53 males) were enrolled after PPCI. Only patients with left ventricular ejection fraction (LVEF) > 40%, as assessed by resting transthoracic echocardiography (TTE), were included. ETT with 12-lead ECG monitoring and right precordial leads, as also MPI were performed at 6 weeks, 6 months, and one year after intervention. Coronary angiography was performed at six months. RESULTS: Single-vessel disease was observed in 46.9% of the patients. The left anterior descending coronary artery was treated in 48.4% of the patients. Angiographic restenosis occurred in 28.8%. Sensitivity, specificity, positive predictive value (PPV), negative predictive value (NPV), and accuracy of ETT in detecting restenosis were not significant. Right precordial leads did not add information. MPI sensitivity, specificity, PPV, NPV, and accuracy correlated with restenosis only in the 6-month follow-up, both when considering summed difference score >2 (p=0.006) and >4 (p=0.014). CONCLUSION: ETT did not discriminate restenosis in this population. MPI performed at 6 months correlated with restenosis and proved useful during follow-up.

  • Angioplasty
  • Coronary Restenosis
  • critical pathways
  • Myocardial Infarction
  • stent
Read Full Article
Creative Commons Attribution (CC BY) Creative Commons license
22/10/2010 DOI: 10.1590/S0066-782X2010005000139 Views 10

How to cite this article

EndNote RIS

Electronic Document Format (Vancouver)

Buchler RDD, Ribeiro EE, Mansur AP, Smanio P, Meneghelo RS, Chalela WA, Buchpiguel CA, et al. Noninvasive assessment of patients undergoing percutaneous intervention in myocardial infarction. Arquivos Brasileiros de Cardiologia 2010;95(5):555-62.

Electronic Document Format (ABNT)

Buchler, Rica Dodo Delmar; Ribeiro, Expedito E.; Mansur, Antonio de Padua; Smanio, Paola; Meneghelo, Romeu Sergio; Chalela, William Azem; Buchpiguel, Carlos Alberto; Buchler, Jorge Roberto; Bates, Eric R.; Martinez, Eulogio E.. Noninvasive assessment of patients undergoing percutaneous intervention in myocardial infarction. Arquivos Brasileiros de Cardiologia, v. 95, n. 5, p. 555-562, Oct. 2010.

Electronic Document Format (APA)

Buchler, R. D. D., Ribeiro, E. E., Mansur, A. P., Smanio, P., Meneghelo, R. S., Chalela, W. A., Buchpiguel, C. A., Buchler, J. R., Bates, E. R., & Martinez, E. E. (2010). Noninvasive assessment of patients undergoing percutaneous intervention in myocardial infarction. Arquivos Brasileiros de Cardiologia, 95(5), 555-562.

Electronic Document Format (ISO)

Buchler, Rica Dodo Delmar and Ribeiro, Expedito E. and Mansur, Antonio de Padua and Smanio, Paola and Meneghelo, Romeu Sergio and Chalela, William Azem and Buchpiguel, Carlos Alberto and Buchler, Jorge Roberto and Bates, Eric R. and Martinez, Eulogio E.. Noninvasive assessment of patients undergoing percutaneous intervention in myocardial infarction. Arquivos Brasileiros de Cardiologia [online]. 2010, vol. 95, n. 5, [cited 2026-11-28], pp. 555-562. Available from: <https://journals.cardiol.br/en/article/noninvasive-assessment-of-patients-undergoing-percutaneous-intervention-in-myocardial-infarction/>. ISSN 0066-782X

  • About ABC Family
  • Internal Regulation
  • Editorial Board
  • Brazilian Society of Cardiology (SBC)

Issues

SBC Guidelines

  • Videos
  • Podcasts
  • News
Accessibility Adjustments

Powered by OneTap

How long do you want to hide the toolbar?
Hide Toolbar Duration
Select your accessibility profile
Vision Impaired Mode
Enhances website's visuals
Seizure Safe Profile
Clear flashes & reduces color
ADHD Friendly Mode
Focused browsing, distraction-free
Blindness Mode
Reduces distractions, improves focus
Epilepsy Safe Mode
Dims colors and stops blinking
Content Modules
Font Size

Default

Line Height

Default

Color Modules
Orientation Modules